
Public Notice:
Renewable Properties, LLC is proposing to build a 5MWac Community Solar Project at 7704 Croom Road, Upper Marlboro, Maryland 20772.
Current Estimated Construction Start Date: First Quarter 2026
Estimated Duration: 6 to 7 months
BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND
IN THE MATTER OF THE APPLICATION OF CROOM ROAD SOLAR, LLC. FOR A
CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW
SOLAR PHOTOVOLTAIC GENERATING FACILITY IN PRINCE GEORGE’S COUNTY,
MARYLAND
CASE NO. 9743
NOTICE OF SECOND PUBLIC COMMENT HEARING
The second public hearing in the above-entitled matter is scheduled for Monday, February 3, 2024, at
6:00 p.m., at The Town Hall of Upper Marlboro located at 14211 School Lane Upper Marlboro,
MD 20772 concerning Croom Road Solar, LLC’s application for a certificate of public convenience and
necessity to construct a 5.0 MW solar photovoltaic generating facility in Prince George’s County,
Maryland (the “Project”). The Project is anticipated to occupy approximately 25 acres of the 40-acre
property associated with Tax Map 0110, Grid 00A3, Parcel 0153, located at the intersection of Croom
Road and Route 301 (Crain Highway), Upper Marlboro, Maryland.
The hearing will begin with a presentation of the Project by the Applicant, followed by a presentation by
the Department of Natural Resources, Power Plant Research Program, the Maryland Office of People’s
Counsel, and the Technical Staff of the Public Service Commission of Maryland as to their
recommendations regarding the Project, if any. Members of the public may attend this second public
hearing in person to listen to the presentations by the Parties and to provide comments about the Project.
If you are unable to attend in person and would like to participate virtually, please send an email to
psc.pulj@gmail.com by 12:00 Noon on January 31, 2025. Otherwise, barring technical issues, a
recording of the hearing will be available on the Public Utility Law Judge (PULJ) Division’s YouTube
Channel, https://www.youtube.com/channel/UCYK5mu0UMAUOqSQowRq2TIQ/.
Written comments on the proposed Project may be submitted electronically or by first class mail on or
before February 7, 2025. Comments submitted electronically must be submitted through the
Commission’s Public Comment Dropbox, which can be accessed through the Commission’s website at
www.psc.state.md.us. Instructions for logging into the Public Comment Dropbox are located under the
“Tools” section of the Commission’s website under the “Make a Public Comment” tab, which can be
accessed via the following link: https://www.psc.state.md.us/make-a-public-comment/. Commenters
utilizing the Public Comment Dropbox are required to complete a one-time registration. Comments
submitted by first class mail must be addressed to: Jamie Bergin, Chief Clerk, Maryland Public Service
Commission, William Donald Schaefer Tower, 6 St. Paul Street, 16th Floor, Baltimore, Maryland 21202.
All comments must include a reference to Case No. 9743. Only one copy is required.
This project will generate energy by harvesting solar power using photovoltaic panels.
Hundreds of community solar customers will receive the option to purchase clean, renewable power from this facility at a 10% to 20% discount. For more information on community solar or to subscribe to an existing community solar site, click the buttons below.
FAQs
Will this project create a noise issue?
After construction, this facility will not generate any noise affecting neighbors.
Is this project going to release anything harmful?
This will be an unmanned facility that does not generate noise, dust, emissions or traffic.
Was the project site something else before?
This project will be built on a previous mining site. Renewable Properties is also working through the Maryland Department of the Environment (MDE) Voluntary Cleanup Program (VCP) to address contamination on this site.
More information on this site and the VCP program can be found here.
Will this harm any of the natural ecosystem present?
This site will be screened from Croom Road by the natural vegetation on the site. A pollinator field will be planted below the panels to increase pollinator habitat and biodiversity.
7704 Croom Road Site Plan
Renewable Properties, LLC is proposing to build a 5MWac Community Solar Project at 7704 Croom Road, Upper Marlboro, Maryland 20772.
Current Estimated Construction Start Date: Second Quarter 2025
Estimated Duration: 6 to 7 months
More information on this site will be provided as it becomes available through the permitting process.
If you have any questions regarding the project, please feel free to contact us at
Contact Us
info@renewablepropertiesllc.com
(229) 436-8898
1400 Pippin Lane
Albany, Georgia 31721